Automatic Train Operation¶
Problem Description¶
Automatic Train Operation Pipeline. Optimizing parameter values of the modules in the automation pipeline, minimizing energy consumption & driving duration
Why was tailoring needed?¶
Baseline algorithm that was tailored (if it exists), motivation for choice: MO-SMAC (large search space and low budget), NSGA-II
Baseline algorithm¶
No response
Tailoring process¶
- What was tailored (Problem model, mutation operator)
- Faster evaluations through a more efficient implementation
- Add penalty if solution is not applicable
What was tailored¶
No response
Main problem characteristics¶
- 10 dimensions
- Multi-objective (2 objectives)
- Mixed types of variables (continuous, discrete)
- Deterministic
- Evaluations (~5-30mins)
References¶
No response
Contact information (optional)¶
No response
Author¶
Carolin Mensendiek No response