Problem Description

Flexible job shop scheduling problem with sequence-dependent setup times.

Why was tailoring needed?

Many constraints and multi-objective.

Baseline algorithm

GCPSO

Tailoring process

The first attempt at handling the constraints was done by means of a penalty function which ended in disaster. All the computational time was used to obtain a feasible solution. Then, a heuristic was implemented to convert the continuous problem representation (job priorities) into a schedule - remaining within the feasible space.

What was tailored

Encoding of continuous solutions to discrete schedules.

Main problem characteristics

  • Discrete variables
  • Many constraints
  • Multi-objective

References

No response

Contact information (optional)

jacomine.grobler@gmail.com

Author

Jacomine Grobler No response